![]() ![]() Areas subject to subsidence and liquefaction.Critical geotechnical hazards that need to be identified include: Sampling techniques vary depending on the project. Typically includes reports done previously for neighboring buildings and actual samples taken at the The geotechnical report contains information about existing project conditions. With information about the soils and geologic conditions on and below the surface at a project site. These studies includeĭata compilation, site analysis reports, site analysis drawings, and comparative site analysis.įor the appropriate use of the Professional Services Agreement when contractingĪ Facility may hire a geotechnical engineer to produce a geotechnical report that provides the Facility Other studies identify existing conditions that may or may not be quantified. Studies also significantly influence project feasibility as well as life-safety and legal issues. Recommendations for incorporating the results of the investigations into the building design. Study reports describe the investigations made and the measurements taken, and they often make These studies are typically performed by consultants who have the specific expertise required. Hydrology studies, land surveys (including boundaries, topography, and utilities), existing buildingĪnalysis, and surveys of existing hazardous materials (environmental due diligence). These studies include geotechnical reports, Studies are conducted to evaluate existing conditions. Project development and to evaluate a project's impacts on the environment. These procedures may be used asįrequently, multiple sites are analyzed for a single project. Office of the President and the Office of the Treasurer. Purchasing campus-related property must follow certain due diligence procedures established by The analysis of gift properties as well as ground leasing campus real property and ![]() ![]() Through a series of investigations to understand the constraints that may be imposed upon a projectĪnd its design. Executive Design Professional Agreement (see FM3:3, 4Īnd Contract Templates - Design and Other Consultants).Ī proposed site, an existing building, or existing infrastructure, on- or off- campus, is analyzed Professional Services Agreement (see FM3:4.1,Īnd Contract Templates - Design and Other Consultants). ( Back to top) 6.2 SITE ANALYSIS References: Value engineering in the pre-design phase scrutinizes the program, site selection, and project budget.The construction cost analysis provides a construction budget amount for the capital improvement budget (CIB) and a cost plan to assist in explaining the budget and in guiding.Programming includes cataloging the spaces and equipment needed, and functional relationships. Programming defines the project needs of the user.Site analysis includes site selection, geotechnical reports, and review of existing structures. ![]() The pre-design phase may include site analysis, programming, construction cost analysis, and value Investigate certain technical issues in order to determine scope, budget, or project schedule. Funds may be available to develop a detailed project program or only to Of funding available in the pre-design phase varies and is a critical factor in determining which The constraints and opportunities of the proposed site, and the cost versus the budget. During the pre-design phase, studies are done to analyze space requirement issues, Pre-design is the phase of analysis that occurs after some form of funding is available and beforeĭesign begins.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |